Over-running engineering works: Utrecht-Den Haag; Utrecht-Leiden (10 October 2018)
-
Disruption resolved Last update
Between Utrecht Centraal and Woerden the train traffic is fully resumed.
-
Delays decreasing
Between Utrecht Centraal and Woerden the restrictions are resolved.
Delays are decreasing.
Service is normal around 7:30 AM hours. -
Update
Between Utrecht Centraal and Woerden far fewer trains are running due to over-running engineering works.
This will take until at least 8:00 AM hours.Train measures
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Woerden and Utrecht Centraal
-
Update
Between Utrecht Centraal and Woerden there are fewer trains running due to over-running engineering works.
This will take until at least 8:00 AM hours.Train measures
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Woerden and Utrecht Centraal
-
Update
Between Vleuten and Bodegraven there are fewer trains running due to over-running engineering works.
This will take until at least 8:00 AM hours.Train measures
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Woerden and Utrecht Centraal
-
Update
Between Vleuten and Bodegraven there are fewer trains running due to over-running engineering works.
It is not known yet how long this will take.Train measures
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Woerden and Utrecht Centraal
-
Disruption
Between Vleuten and Bodegraven there is a service disruption due to over-running engineering works.
Updates will follow as more information becomes available.
More about this disruption
Statistics
This disruption started at 5:34 AM on October 10, 2018 and took 1 hour, 53 minutes in total.
For statistics, this disruption is caused due to over-running engineering works.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS.
Got delayed due to this disruption? You may be reimbursed.