Power failure: Amsterdam-Brussel-Paris (HSL) (9 February 2019)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Amsterdam Centraal and Rotterdam Centraal trains are running via an alternative route due to a power failure.
The extra travel time is more than 45 minutes.
More about this disruption
Statistics
This disruption started at 8:55 PM on February 9, 2019 and took 0 seconds in total.
For statistics, this disruption is caused due to a power failure.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS, NS International, Thalys and Eurostar.
Got delayed due to this disruption? You may be reimbursed.