harde wind HSL

Strong winds on the high speed line: Dordrecht-Breda (4 March 2019)

  1. Disruption resolved Last update

    Between Dordrecht and Breda the train traffic is fully resumed.

  2. Update

    Between Dordrecht and Breda the train schedule is modified due to strong winds on the high-speed line.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 10:30 AM hours.

    Train measures

    • Intercity 2300 Dordrecht - Breda is cancelled between Dordrecht and Breda
  3. Update

    Between Dordrecht and Breda the train schedule is modified due to strong winds on the high-speed line.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 5:00 PM hours.

    Train measures

    • Intercity 2300 Dordrecht - Breda is cancelled between Dordrecht and Breda
  4. Disruption

    Between Dordrecht and Breda the train schedule is modified due to strong winds on the high-speed line.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 5:00 PM hours.

More about this disruption

Statistics

This disruption started at 5:31 AM on March 4, 2019 and took 4 hours, 16 minutes in total.

For statistics, this disruption is caused due to strong winds on the high speed line.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights