Strong winds on the high speed line: Dordrecht-Breda (9 March 2019)
-
Disruption resolved Last update
Between Dordrecht and Breda the train schedule is modified due to strong winds on the high-speed line.
The extra travel time may be up to 15 minutes. -
Disruption
Between Dordrecht and Breda the train schedule is modified due to strong winds on the high-speed line.
The extra travel time may be up to 15 minutes.
This will take the rest of the day.
More about this disruption
Statistics
This disruption started at 2:58 PM on March 9, 2019 and took 7 minutes in total.
For statistics, this disruption is caused due to strong winds on the high speed line.
Operators
This disruption affects trains operated by NS.
Got delayed due to this disruption? You may be reimbursed.