Over-running engineering works: Amsterdam-Rotterdam-Brussel (HSL) (17 April 2019)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Amsterdam Centraal and Schiphol Airport no international trains are running due to over-running engineering works.
The extra travel time may be up to 45 minutes.
More about this disruption
Statistics
This disruption started at 5:47 AM on April 17, 2019 and took 0 seconds in total.
For statistics, this disruption is caused due to over-running engineering works.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS, NS International, Thalys and Eurostar.
Got delayed due to this disruption? You may be reimbursed.