uitloop werkzaamheden

Over-running engineering works: Den Haag-Rotterdam; Leiden-Rotterdam (30 May 2019)

  1. Disruption resolved Last update

    Between Den Haag HS and Delft Zuid far fewer trains are running due to over-running engineering works.

More about this disruption

Statistics

This disruption started at 5:24 AM on May 30, 2019 and took 0 seconds in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights