seinstoring

Signal failure: Apeldoorn-Zutphen (15 September 2019)

  1. Disruption resolved Last update

    Between Apeldoorn and Zutphen the train traffic is fully resumed.

More about this disruption

Statistics

This disruption started at 7:53 AM on September 15, 2019 and took 0 seconds in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights