gladde sporen

Slippery railway tracks: Breukelen-Utrecht-Veenendaal (27 November 2019)

  1. Disruption resolved Last update

    Between Breukelen and Utrecht Centraal the train traffic is fully resumed.

    Train measures

    • Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Breukelen and Utrecht Centraal
  2. Update

    Between Breukelen and Utrecht Centraal fewer Sprinter trains are running due to slippery railway tracks.
    The extra travel time is about 15 minutes.
    Service is normal around 7:45 PM hours.

    Train measures

    • Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Breukelen and Utrecht Centraal
  3. Update

    Between Breukelen and Utrecht Centraal fewer Sprinter trains are running due to slippery railway tracks.
    The extra travel time is about 15 minutes.
    This will take until approximately 7:15 PM hours.

    Train measures

    • Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Breukelen and Utrecht Centraal
  4. Update

    Between Breukelen and Utrecht Centraal fewer Sprinter trains are running due to slippery railway tracks.
    The extra travel time is about 15 minutes.
    This will take until approximately 7:00 PM hours.

    Train measures

    • Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Breukelen and Utrecht Centraal
  5. Update

    Between Breukelen and Utrecht Centraal fewer Sprinter trains are running due to slippery railway tracks.
    The extra travel time is about 15 minutes.
    This will take until approximately 7:00 PM hours.

  6. Disruption

    Between Breukelen and Utrecht Centraal fewer Sprinter trains are running due to slippery railway tracks.
    The extra travel time is about 15 minutes.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 4:19 PM on November 27, 2019 and took 3 hours, 21 minutes in total.

For statistics, this disruption is caused due to slippery railway tracks.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and NS International.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights