seinstoring

Signal failure: Almere-Lelystad (10 March 2020)

  1. Disruption resolved Last update

    Between Almere Centrum and Lelystad Centrum the train traffic is fully resumed.

    Train measures

    • Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Almere Centrum and Lelystad Centrum
  2. Update

    Between Almere Centrum and Lelystad Centrum there are fewer trains running due to a signal failure.
    This will take until approximately 12:15 PM hours.

    Train measures

    • Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Almere Centrum and Lelystad Centrum
  3. Update

    Between Almere Centrum and Lelystad Centrum there are fewer trains running due to a signal failure.
    This will take until approximately 11:45 AM hours.

    Train measures

    • Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Almere Centrum and Lelystad Centrum
  4. Update

    Between Almere Centrum and Lelystad Centrum there are fewer trains running due to a signal failure.
    This will take until approximately 11:45 AM hours.

  5. Disruption

    Between Almere Centrum and Lelystad Centrum there are fewer trains running due to a signal failure.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 8:45 AM on March 10, 2020 and took 3 hours, 17 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights