sein- en wisselstoring

Large signalling and points failure: Sittard-Heerlen-Kerkrade (25 June 2020)

  1. Disruption resolved Last update

    Between Sittard and Kerkrade Centrum the train traffic is fully resumed.

  2. Update

    Between Sittard and Kerkrade Centrum no trains are running due to a large signalling and points failure.
    The extra travel time is more than 60 minutes.
    This will take until approximately 5:00 PM hours.

  3. Disruption

    Between Sittard and Kerkrade Centrum no trains are running due to a power failure.
    The extra travel time is more than 60 minutes.
    This will take until approximately 5:00 PM hours.

More about this disruption

Statistics

This disruption started at 2:19 PM on June 25, 2020 and took 33 minutes in total.

For statistics, this disruption is caused due to a large signalling and points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights