seinstoring

Signal failure: Groningen-Delfzijl (11 May 2022)

  1. Disruption resolved Last update

    Between Bedum and Stedum the train traffic is fully resumed.

  2. Delays decreasing

    Between Bedum and Stedum the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 8:45 PM hours.

  3. Update

    Between Bedum and Stedum no trains are running due to a signal failure.
    The extra travel time is more than 60 minutes.
    This will take until approximately 8:45 PM hours.

    Train measures

    • Stoptrein 37700 Groningen - Delfzijl is cancelled between Sauwerd and Delfzijl
  4. Update

    Between Bedum and Stedum no trains are running due to a signal failure.
    The extra travel time is more than 60 minutes.
    This will take until approximately 9:45 PM hours.

    Train measures

    • Stoptrein 37700 Groningen - Delfzijl is cancelled between Sauwerd and Delfzijl
  5. Update

    Between Bedum and Stedum no trains are running due to a signal failure.
    The extra travel time is more than 60 minutes.
    This will take until approximately 9:00 PM hours.

    Train measures

    • Stoptrein 37700 Groningen - Delfzijl is cancelled between Sauwerd and Delfzijl
  6. Disruption

    Between Sauwerd and Delfzijl there is a service disruption due to a signal failure.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 6:52 PM on May 11, 2022 and took 1 hour, 50 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights