beschadigde spoorbrug

Damaged railway bridge: Zutphen-Hengelo (2 December 2022)

  1. Disruption resolved Last update

    Between Delden and Hengelo the train traffic is fully resumed.

  2. Delays decreasing

    Between Delden and Hengelo the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 3:30 PM hours.

  3. Update

    Between Delden and Hengelo no trains are running due to a damaged railway bridge.
    The extra travel time is more than 60 minutes.
    This will take until approximately 4:15 PM hours.

    Train measures

    • Stoptrein 31200-31295 Zutphen - Hengelo - Oldenzaal is cancelled between Delden and Oldenzaal
  4. Disruption

    Between Delden and Hengelo no trains are running due to a damaged railway bridge.
    The extra travel time is more than 60 minutes.
    This will take until approximately 4:15 PM hours.

More about this disruption

Statistics

This disruption started at 2:53 PM on December 2, 2022 and took 37 minutes in total.

For statistics, this disruption is caused due to a damaged railway bridge.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Keolis and Blauwnet.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights