beperkingen materieel

Problems with the rolling stock: Heerlen-Aachen Hbf (18 March 2023)

  1. Disruption resolved Last update

    Between Herzogenrath and Landgraaf the train traffic is fully resumed.

  2. Disruption

    Between Herzogenrath and Landgraaf there are fewer trains running due to problems with the rolling stock.
    It is not known yet how long this will take.

    Train measures

    • Sneltrein 18900 Randwyck - Heerlen - Aachen Hbf runs less often between Herzogenrath and Landgraaf

More about this disruption

Statistics

This disruption started at 5:26 PM on March 18, 2023 and took 5 hours, 41 minutes in total.

For statistics, this disruption is caused due to problems with the rolling stock.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights