stroomstoring

Power failure: Utrecht-Hilversum; Utrecht-Spoorwegmuseum (7 April 2023)

  1. Disruption resolved Last update

    Between Utrecht Overvecht and Bilthoven the train traffic is fully resumed.
    Between Utrecht Overvecht and Hilversum the train traffic is fully resumed.

  2. Disruption

    Between Utrecht Overvecht and Bilthoven there is a service disruption due to a power failure.
    Between Utrecht Overvecht and Hilversum there is a service disruption due to a power failure.
    This will take until approximately 5:30 AM hours.

More about this disruption

Statistics

This disruption started at 2:37 AM on April 7, 2023 and took 5 minutes in total.

For statistics, this disruption is caused due to a power failure.

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights