Power failure: Utrecht-Hilversum (22 January)
-
Disruption resolved Last update
Between Utrecht Centraal and Hilversum the train traffic is fully resumed.
-
Update
Between Utrecht Centraal and Hilversum trains are crowded and travel times may be longer due to a power failure.
This will take until approximately 8:00 PM hours.Train measures
- Intercity 2400 Dordrecht/Lelystad C. - Lelystad C./Dordrecht is cancelled between Leiden Centraal and Schiphol Airport
-
Disruption
Between Utrecht Centraal and Hilversum trains are crowded and travel times may be longer due to a power failure.
This will take until approximately 7:30 PM hours.Train measures
- Intercity 2400 Dordrecht/Lelystad C. - Lelystad C./Dordrecht is cancelled between Leiden Centraal and Schiphol Airport
More about this disruption
Statistics
This disruption started at 5:58 PM on January 22, 2024 and took 37 minutes in total.
For statistics, this disruption is caused due to a power failure.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS.
Got delayed due to this disruption? You may be reimbursed.