Signalling and points failure: Groningen-Delfzijl (12 February)
-
Disruption resolved Last update
Between Bedum and Stedum the train traffic is fully resumed.
-
Delays decreasing
Between Bedum and Stedum the restrictions are resolved.
Delays are decreasing.
Service is normal around 5:45 PM hours. -
Update
Between Bedum and Stedum no trains are running due to a signalling and points failure.
The extra travel time is more than 60 minutes.
This will take until approximately 6:15 PM hours.Train measures
- Stoptrein 37700 Delfzijl/Groningen - Groningen/Delfzijl is cancelled between Bedum and Stedum
-
Update
Between Bedum and Stedum no trains are running due to a signalling and points failure.
The extra travel time is more than 60 minutes.
This will take until approximately 6:15 PM hours.Train measures
- Stoptrein 37700 Groningen/Delfzijl - Delfzijl/Groningen is cancelled between Bedum and Stedum
-
Update
Between Bedum and Stedum no trains are running due to a signalling and points failure.
This will take until approximately 6:15 PM hours.Train measures
- Stoptrein 37700 Groningen/Delfzijl - Delfzijl/Groningen is cancelled between Bedum and Stedum
-
Update
Between Bedum and Stedum no trains are running due to a signalling and points failure.
This will take until approximately 6:15 PM hours. -
Disruption
Between Groningen and Stedum there is a service disruption due to a signalling and points failure.
This will take until approximately 6:15 PM hours.
More about this disruption
Statistics
This disruption started at 4:07 PM on February 12, 2024 and took 1 hour, 33 minutes in total.
For statistics, this disruption is caused due to a signalling and points failure.
Operators
This disruption affects trains operated by Arriva.
Got delayed due to this disruption? You may be reimbursed.