stroomstoring

Power failure: Utrecht-'s-Hertogenbosch (15 February)

  1. Disruption resolved Last update

    Between Utrecht Centraal and 's-Hertogenbosch the train traffic is fully resumed.

  2. Update

    Between Utrecht Centraal and 's-Hertogenbosch fewer intercities are running due to a power failure.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 9:30 PM hours.

    Train measures

    • Intercity 3900 Heerlen/Enkhuizen - Enkhuizen/Heerlen is cancelled between Utrecht Centraal and Eindhoven Centraal
  3. Update

    Between Utrecht Centraal and 's-Hertogenbosch fewer intercities are running due to a power failure.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 9:00 PM hours.

    Train measures

    • Intercity 3900 Heerlen/Enkhuizen - Enkhuizen/Heerlen is cancelled between Utrecht Centraal and Eindhoven Centraal
  4. Disruption

    Between Utrecht Centraal and 's-Hertogenbosch fewer intercities are running due to a power failure.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 9:00 PM hours.

More about this disruption

Statistics

This disruption started at 6:54 PM on February 15, 2024 and took 1 hour, 14 minutes in total.

For statistics, this disruption is caused due to a power failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights