Signalling and points failure: Groningen-Roodeschool (12 January 2011)

  1. Update Last update

    De beperkingen tussen Usquert en Baflo als gevolg van een sein- en wisselstoring zijn voorbij. Het treinverkeer is volledig hervat.

More about this disruption

Statistics

This disruption started at 4:10 PM on January 12, 2011 and took 1 hour, 55 minutes in total.

For statistics, this disruption is caused due to a signalling and points failure.

Affected lines