Level crossing failure: Groningen-Delfzijl (15 August)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Sauwerd and Stedum the train traffic is fully resumed.
More about this disruption
Statistics
This disruption started at 6:48 PM on August 15, 2024 and took 0 seconds in total.
For statistics, this disruption is caused due to a level crossing failure.
Operators
This disruption affects trains operated by Arriva.
Got delayed due to this disruption? You may be reimbursed.