signal and level crossing failure

Signal and level crossing failure: Hoorn-Zaandam (3 November 2013)

  1. Update Last update

    Tussen Overwhere en Hoorn rijden geen treinen door een sein- en overwegstoring.
    Er rijden bussen tussen Overwhere en Hoorn.
    Houdt u rekening met een extra reistijd van 15 - 30 min.
    De verstoring is naar verwachting 04 november rond 2:00 uur verholpen.

More about this disruption

Statistics

This disruption started at 11:50 PM on November 3, 2013 and took 2 hours, 42 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights