signal and level crossing failure

Signal and level crossing failure: Arnhem-Winterswijk (14 January 2011)

  1. Update Last update

    De beperkingen tussen Winterswijk en Doetinchem als gevolg van een sein- en overwegstoring zijn voorbij.
    Het treinverkeer is volledig hervat.

More about this disruption

Statistics

This disruption started at 3:55 PM on January 14, 2011 and took 1 hour, 30 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights