engineering works

Engineering works: Amsterdam - Schagen

Situation

Between Uitgeest and Alkmaar the timetable has been changed due to engineering works.
The extra travel time may be up to 45 minutes.

Period

Between Saturday, February 20, 2021 12:20 AM hours and Monday, March 1, 2021 2:00 AM hours.

Advice

Passengers between Amsterdam Centraal and Alkmaar travel via Hoorn.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Saturday, February 20, 2021 12:20 AM to Saturday, February 20, 2021 1:45 AM
  • Saturday, February 20, 2021 1:45 AM to Monday, February 22, 2021 2:00 AM
  • Monday, February 22, 2021 2:00 AM to Monday, March 1, 2021 2:00 AM