engineering works

Engineering works: Utrecht - Hilversum; Utrecht - Almere

Situation

Between Utrecht Centraal and Hilversum the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Monday, February 22, 2021 4:00 AM hours and Saturday, February 27, 2021 2:00 AM hours.

Advice

Passengers between Utrecht Centraal and Almere Centrum travel via Amsterdam Zuid. The extra travel time is up to 15 minutes.
Passengers between Naarden-Bussum and Almere Centrum travel via Weesp. The extra travel time is up to 15 minutes.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Monday, February 22, 2021 4:00 AM and Saturday, February 27, 2021 2:00 AM.