Engineering works: Utrecht - Hilversum; Utrecht - Almere
Situation
Between Utrecht Centraal and Hilversum the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Monday, February 22, 2021 4:00 AM hours and Saturday, February 27, 2021 2:00 AM hours.
Advice
Passengers between Utrecht Centraal and Almere Centrum travel via Amsterdam Zuid. The extra travel time is up to 15 minutes.
Passengers between Naarden-Bussum and Almere Centrum travel via Weesp. The extra travel time is up to 15 minutes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Utrecht Overvecht, Hollandsche Rading, Hilversum Sportpark and Hilversum.
- Intercity 1500 Amsterdam C. - Amersfoort C. will make an extra stop at Naarden-Bussum
- Sprinter 4900 Utrecht C. - Hilversum - Almere C. is cancelled between Utrecht Centraal and Almere Centrum
- Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Utrecht Centraal and Hoofddorp
- Sprinter 14900 Utrecht C. - Hilversum - Almere C. is cancelled between Utrecht Centraal and Almere Centrum
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, February 22, 2021 4:00 AM and Saturday, February 27, 2021 2:00 AM.