Engineering works: Blerick
Situation
From and to Blerick the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, February 20, 2021 8:30 AM hours and Friday, February 26, 2021 9:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo does not call at Blerick (only in direction of Blerick)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, February 20, 2021 8:30 AM and Friday, February 26, 2021 9:00 PM.