Engineering works: Roosendaal - Vlissingen
Situation
Between Bergen op Zoom and Vlissingen buses are running due to engineering works.
The extra travel time may be up to 45 minutes.
Period
Between Saturday, March 6, 2021 4:00 AM hours and Monday, March 8, 2021 2:00 AM hours.
Advice
Passengers between Kapelle-Biezelinge and Kruiningen-Yerseke travel via Goes.
Passengers between Arnemuiden and Goes travel via Middelburg.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Bergen op Zoom, Rilland-Bath, Krabbendijke, Kruiningen-Yerseke, Goes, Middelburg, Vlissingen Souburg and Vlissingen.
- Express buses are running between Bergen op Zoom, Goes, Middelburg, Vlissingen Souburg and Vlissingen.
- Minibuses are available between Kapelle-Biezelinge and Goes.
- Minibuses are available between Arnemuiden and Middelburg.
- Intercity 2200 Amsterdam C. - Haarlem - Rotterdam C. - Vlissingen is cancelled between Bergen op Zoom and Vlissingen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, March 6, 2021 4:00 AM and Monday, March 8, 2021 2:00 AM.