Engineering works: Amsterdam - Rotterdam - Brussel (HSL)
Situation
Between Amsterdam Centraal and Rotterdam Centraal the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
On Sunday, March 28, 2021 between 5:45 AM and 7:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity
9692 to 9692
Den Haag HS - Rotterdam C. - Antwerpen-C. - Brussel-Z. Midi
- does not call at Den Haag HS (only in direction of Rotterdam Centraal)
- departs later from Amsterdam Centraal between Amsterdam Centraal and Rotterdam Centraal (only in direction of Rotterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, March 28, 2021 5:45 AM and Sunday, March 28, 2021 7:00 AM.