Engineering works: Lelystad - Zwolle
Situation
Between Lelystad Centrum and Zwolle the timetable has been changed due to engineering works.
The extra travel time may be up to 45 minutes.
Period
Between Sunday, February 21, 2021 10:00 AM hours and Monday, February 22, 2021 4:30 AM hours.
Advice
Passengers between Schiphol Airport and Zwolle travel via Amersfoort Centraal.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Dronten and Kampen Zuid.
- Intercity 700 Den Haag C. - Schiphol Airport - Lelystad C. - Groningen is cancelled between Lelystad Centrum and Zwolle
- Intercity 1800 Den Haag C. - Schiphol Airport - Lelystad C. - Leeuwarden is cancelled between Lelystad Centrum and Zwolle
- Sprinter 14600 Amsterdam C. - Lelystad C. - Zwolle is cancelled between Dronten and Kampen Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, February 21, 2021 10:00 AM and Monday, February 22, 2021 4:30 AM.