engineering works

Engineering works: Heerlen - Aachen Hbf

Situation

Between Heerlen and Aachen Hbf the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Sunday, March 7, 2021 11:30 PM hours and Friday, March 12, 2021 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, March 7, 2021 11:30 PM and Friday, March 12, 2021 2:00 AM.