Engineering works: Schiphol - Lelystad; Schiphol - Utrecht
Situation
Between Schiphol Airport and Almere Centrum the timetable has been changed due to engineering works.
Between Schiphol Airport and Utrecht Centraal the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, March 13, 2021 4:00 AM hours and Monday, March 15, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity
700
Den Haag C. - Schiphol Airport - Lelystad C. - Groningen
- is cancelled between Schiphol Airport and Almere Centrum
- runs today from/to Almere Centrum between Amsterdam Centraal and Almere Centrum
-
Intercity
1800
Den Haag C. - Schiphol Airport - Lelystad C. - Leeuwarden
- runs today from/to Almere Centrum between Amsterdam Centraal and Almere Centrum
- is cancelled between Schiphol Airport and Almere Centrum
- Intercity 2600 Amsterdam C. - Almere C. is cancelled between Amsterdam Centraal and Almere Centrum
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen is cancelled between Schiphol Airport and Utrecht Centraal
-
Sprinter
3300
Kersenboogerd - Zaandam - Schiphol Airport - Leiden C.
- is cancelled between Leiden Centraal and Amsterdam Sloterdijk
- runs today from/to Amsterdam Centraal between Amsterdam Sloterdijk and Amsterdam Centraal
- Sprinter 4600 Den Haag C. - Schiphol Airport - Amsterdam C. is cancelled between Hoofddorp and Amsterdam Centraal
- Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Hoofddorp and Amsterdam Zuid
- Extra trein 28500 Leiden C. - Schiphol Airport - Amsterdam C. runs as extra service between Leiden Centraal and Amsterdam Centraal
- Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Schiphol Airport and Lelystad Centrum
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, March 13, 2021 4:00 AM and Monday, March 15, 2021 2:00 AM.