Engineering works: Amsterdam - Brussel - Paris (HSL)
Situation
Between Amsterdam Centraal and Antwerpen-Centraal are international trains diverted due to engineering works.
The extra travel time is about 30 minutes.
Period
Between Saturday, March 6, 2021 4:00 AM hours and Monday, March 8, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Thalys 9300 Amsterdam C. - Rotterdam C. - Brussel Z./Midi - Paris-Nord is diverted between Rotterdam Centraal and Antwerpen-Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, March 6, 2021 4:00 AM and Monday, March 8, 2021 2:00 AM.