Engineering works elsewhere: Rotterdam - Dordrecht
Situation
Between Rotterdam Centraal and Dordrecht the timetable has been changed due to engineering works elsewhere.
Period
Between Sunday, April 4, 2021 4:00 AM hours and Monday, April 5, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Lelystad Centrum and Dordrecht
- Intercity 3700 Dordrecht - Schiphol Airport - Utrecht C. - Venlo is cancelled between Rotterdam Centraal and Dordrecht
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, April 4, 2021 4:00 AM and Monday, April 5, 2021 2:00 AM.