Engineering works: Hilversum - Amersfoort
Situation
Between Hilversum and Amersfoort Centraal buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, April 3, 2021 4:30 AM hours and Tuesday, April 6, 2021 3:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Hilversum and Amersfoort Centraal.
- Local buses are running between Hilversum, Baarn and Amersfoort Centraal.
- Intercity 1500 Amsterdam C. - Amersfoort C. is cancelled between Hilversum and Amersfoort Centraal
- Intercity 1600 Schiphol Airport - Amersfoort C. - Hengelo - Enschede is cancelled between Hilversum and Enschede
- Intercity 11600 Schiphol Airport - Amersfoort C. - Schothorst is cancelled between Hilversum and Amersfoort Schothorst
- Sprinter 15800 Amsterdam C. - Vathorst is cancelled between Hilversum and Amersfoort Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, April 3, 2021 4:30 AM and Tuesday, April 6, 2021 3:30 AM.