engineering works

Engineering works: Amsterdam - München - Innsbruck; Amsterdam - Passau - Wien

Situation

Between Amsterdam Centraal and Utrecht Centraal are international trains diverted due to engineering works.
There is no additional travel time..

Period

Between Saturday, May 1, 2021 7:00 PM hours and Monday, May 3, 2021 8:35 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Saturday, May 1, 2021 7:00 PM to Saturday, May 1, 2021 8:35 PM
  • Sunday, May 2, 2021 7:00 PM to Sunday, May 2, 2021 8:35 PM
  • Monday, May 3, 2021 7:00 PM to Monday, May 3, 2021 8:35 PM