Engineering works: Amsterdam - München - Innsbruck; Amsterdam - Passau - Wien
Situation
Between Amsterdam Centraal and Bonn Hbf are international trains diverted due to engineering works.
There is no additional travel time..
Period
On Friday, May 21, 2021 between 7:00 PM and 8:35 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Speciale Trein
39421 to 39439
Amsterdam C. - Bonn Hbf
- is being diverted and will make an extra call at 's-Hertogenbosch and Mönchengladbach Hbf between Amsterdam Centraal and Bonn Hbf
- is diverted and will not call at Arnhem Centraal, Düsseldorf Hbf and Köln Hbf between Amsterdam Centraal and Bonn Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
No lines are linked (yet) to these engineering works.
Time periods
These engineering works are in effect between Friday, May 21, 2021 7:00 PM and Friday, May 21, 2021 8:35 PM.