Engineering works: Schiphol - Lelystad
Situation
Between Schiphol Airport and Almere Centrum the timetable has been changed due to engineering works.
Period
Between Sunday, May 9, 2021 11:00 PM hours and Monday, May 10, 2021 12:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Schiphol Airport and Amsterdam Zuid.
-
Intercity
700
Den Haag C. - Schiphol Airport - Lelystad C. - Groningen
- will make an extra stop at Amsterdam Centraal, Amsterdam Sloterdijk and Amsterdam Lelylaan (only in direction of Schiphol Airport)
- is diverted and will not call at Amsterdam Zuid between Almere Centrum and Schiphol Airport (only in direction of Schiphol Airport)
-
Intercity
1800
Den Haag C. - Schiphol Airport - Lelystad C. - Leeuwarden
- is diverted and will not call at Amsterdam Zuid between Almere Centrum and Schiphol Airport (only in direction of Schiphol Airport)
- will make an extra stop at Amsterdam Centraal, Amsterdam Sloterdijk and Amsterdam Lelylaan (only in direction of Schiphol Airport)
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo is cancelled between Schiphol Airport and Amsterdam Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, May 9, 2021 11:00 PM and Monday, May 10, 2021 12:30 AM.