Engineering works: Roosendaal - Essen (B)
Situation
Between Roosendaal and Essen (B) buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, May 22, 2021 4:00 AM hours and Tuesday, May 25, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Roosendaal and Essen (B).
- Stoptrein 2500 Roosendaal - Antwerpen-C./Puurs is cancelled between Roosendaal and Essen (B)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, May 22, 2021 4:00 AM and Tuesday, May 25, 2021 2:00 AM.