Engineering works: Breda - Tilburg
Situation
Between Breda and Tilburg the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, May 29, 2021 4:00 AM hours and Monday, May 31, 2021 2:00 AM hours.
Advice
Passengers between Rotterdam Centraal and Eindhoven Centraal travel via Utrecht Centraal. The extra travel time is up to 45 minutes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Breda and Gilze-Rijen.
- Intercity 1100 Den Haag C. - Rotterdam C. - Breda is cancelled between Breda and Eindhoven Centraal
- Intercity 3600 Zwolle - Deventer - Nijmegen - Roosendaal is cancelled between Breda and Gilze-Rijen
- Sprinter 5200 Tilburg Uni. - Eindhoven C. runs twice per hour between Tilburg Universiteit and Eindhoven Centraal
- Sprinter 6600 Dordrecht - Breda - 's-Hertogenbosch - Arnhem C. is cancelled between Breda and Tilburg
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, May 29, 2021 4:00 AM and Monday, May 31, 2021 2:00 AM.