Engineering works: 's-Hertogenbosch - Tilburg
Situation
Between 's-Hertogenbosch and Tilburg the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, June 5, 2021 4:00 AM hours and Monday, June 7, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3600 Zwolle - Deventer - Nijmegen - Roosendaal is cancelled between 's-Hertogenbosch and Roosendaal
- Intercity 703600 Tilburg - Roosendaal runs as extra service between Tilburg and Roosendaal
- Sprinter 6600 Dordrecht - Breda - 's-Hertogenbosch - Arnhem C. is cancelled between 's-Hertogenbosch and Dordrecht
- Sprinter 706600 's-Hertogenbosch - Dordrecht runs twice per hour between 's-Hertogenbosch and Dordrecht
- Sprinter 6600 Dordrecht - Breda - 's-Hertogenbosch - Arnhem C. is cancelled between 's-Hertogenbosch and Dordrecht
- Sprinter 706600 's-Hertogenbosch - Dordrecht runs twice per hour between 's-Hertogenbosch and Dordrecht
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, June 5, 2021 4:00 AM and Monday, June 7, 2021 2:00 AM.