Engineering works: Zwolle
Situation
From and to Zwolle the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Monday, July 5, 2021 4:00 AM hours and Tuesday, July 6, 2021 7:30 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Zwolle and 't Harde.
- Minibuses are available between Zwolle, Wezep and 't Harde.
- Local buses are running between Zwolle, Zwolle Stadshagen and Kampen.
- Express buses are running between Zwolle and Kampen Zuid.
- Intercity 500 Rotterdam C. - Utrecht C. - Zwolle - Groningen is cancelled between Zwolle and 't Harde
- Intercity 600 Rotterdam C. - Utrecht C. - Zwolle - Leeuwarden is cancelled between Zwolle and 't Harde
- Intercity 700 Den Haag C. - Schiphol Airport - Lelystad C. - Groningen is cancelled between Zwolle and Kampen Zuid
- Intercity 1800 Den Haag C. - Schiphol Airport - Lelystad C. - Leeuwarden is cancelled between Zwolle and Kampen Zuid
- Sprinter 5600 Utrecht C. - Amersfoort C. - Zwolle is cancelled between Zwolle and 't Harde
- Sprinter 8500 to 8595 Zwolle - Kampen is cancelled between Zwolle and Kampen
- Sprinter 14600 Amsterdam C. - Lelystad C. - Zwolle is cancelled between Zwolle and Kampen Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, July 5, 2021 4:00 AM and Tuesday, July 6, 2021 7:30 PM.