engineering works elsewhere

Engineering works elsewhere: Hilversum - Amersfoort

Situation

Between Hilversum and Amersfoort Centraal the timetable has been changed due to engineering works elsewhere.
The extra travel time may be up to 15 minutes.

Period

Between Friday, June 25, 2021 4:00 AM hours and Monday, June 28, 2021 2:00 AM hours.

Advice

Passengers between Amsterdam Centraal and Amersfoort Centraal travel via Utrecht Centraal. The extra travel time is up to 30 minutes.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, June 25, 2021 4:00 AM and Monday, June 28, 2021 2:00 AM.