Engineering works: Amsterdam - München - Innsbruck; Amsterdam - Passau - Wien
Situation
Between Amsterdam Centraal and Bonn Hbf are international trains diverted due to engineering works.
There is no additional travel time..
Period
Between Wednesday, August 11, 2021 6:45 PM hours and Thursday, August 12, 2021 8:35 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Nightjet
421 to 421
Amsterdam C. - Utrecht C. - Nürnberg Hbf - Innsbruck Hbf/Wien Hbf
- is being diverted and will make an extra call at 's-Hertogenbosch between Amsterdam Centraal and Bonn Hbf
- is diverted and will not call at Arnhem Centraal, Duisburg Hbf and Düsseldorf Hbf between Amsterdam Centraal and Bonn Hbf
-
Nightjet
421 to 421
Amsterdam C. - Utrecht C. - Nürnberg Hbf - Innsbruck Hbf/Wien Hbf
- is being diverted and will make an extra call at 's-Hertogenbosch between Amsterdam Centraal and Bonn Hbf
- is diverted and will not call at Arnhem Centraal, Duisburg Hbf and Düsseldorf Hbf between Amsterdam Centraal and Bonn Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
No lines are linked (yet) to these engineering works.
Time periods
These engineering works are in effect between:
- Wednesday, August 11, 2021 6:45 PM to Wednesday, August 11, 2021 8:35 PM
- Thursday, August 12, 2021 6:45 PM to Thursday, August 12, 2021 8:35 PM