Engineering works: Utrecht - Spoorwegmuseum
Situation
Between Utrecht Centraal and Utrecht Maliebaan the timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.
Period
On Monday, June 21, 2021 between 7:00 AM and 6:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Speciale Trein 28300 Utrecht C. - Maliebaan is cancelled between Utrecht Centraal and Utrecht Maliebaan
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, June 21, 2021 7:00 AM and Monday, June 21, 2021 6:00 PM.