Engineering works elsewhere: Utrecht - Rhenen
Situation
Between Utrecht Centraal and Utrecht Vaartsche Rijn the timetable has been changed due to engineering works elsewhere.
The extra travel time is about 15 minutes.
Period
Between Saturday, July 3, 2021 4:00 AM hours and Monday, July 12, 2021 2:00 AM hours.
Advice
Passengers from Utrecht Vaartsche Rijn towards Rhenen travel via Utrecht Centraal.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen does not call at Utrecht Vaartsche Rijn (only in direction of Rhenen)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, July 3, 2021 4:00 AM and Monday, July 12, 2021 2:00 AM.