Engineering works: Dordrecht - Roosendaal
Situation
Between Dordrecht and Lage Zwaluwe the timetable has been changed due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Saturday, July 10, 2021 4:00 AM hours and Monday, July 12, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 5900 Dordrecht - Roosendaal is cancelled between Dordrecht and Lage Zwaluwe
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, July 10, 2021 4:00 AM and Monday, July 12, 2021 2:00 AM.