Engineering works on the high-speed line: Rotterdam - Breda (HSL)
Situation
Between Rotterdam Centraal and Breda the timetable has been changed due to engineering works on the high-speed line.
The extra travel time is about 15 minutes.
Period
Between Saturday, July 10, 2021 4:00 AM hours and Monday, July 12, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda is cancelled between Rotterdam Centraal and Breda
- Intercity 1100 Den Haag C. - Rotterdam C. - Breda is being diverted and will make an extra call at Dordrecht between Rotterdam Centraal and Breda
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, July 10, 2021 4:00 AM and Monday, July 12, 2021 2:00 AM.