engineering works

Engineering works: Amsterdam - Utrecht; Amsterdam - Schiphol

Situation

Between Amsterdam Centraal and Schiphol Airport the timetable has been adjusted and buses are running due to engineering works.
Between Amsterdam Bijlmer ArenA and Amsterdam Centraal the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

In the night from Saturday to Sunday, August 1, 2021 between 12:50 AM and 5:45 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, August 1, 2021 12:50 AM and Sunday, August 1, 2021 5:45 AM.