engineering works

Engineering works: Utrecht - 's-Hertogenbosch

Situation

Between Utrecht Centraal and 's-Hertogenbosch the timetable has been changed due to engineering works.
The extra travel time may be up to 45 minutes.

Period

Between Saturday, August 21, 2021 12:50 AM hours and Monday, August 23, 2021 2:00 AM hours.

Advice

Passengers between Eindhoven Centraal and Schiphol Airport and Amsterdam Centraal travel via Rotterdam Centraal.
Passengers between Houten Castellum and Geldermalsen travel via Houten.
Passengers between Utrecht Centraal and 's-Hertogenbosch travel via Nijmegen.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, August 21, 2021 12:50 AM and Monday, August 23, 2021 2:00 AM.