engineering works

Engineering works: Schiphol Airport

Situation

From and to Schiphol Airport the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Friday, August 20, 2021 4:00 AM hours and Monday, August 23, 2021 2:00 AM hours.

Advice

Passengers between Amersfoort Centraal and Amsterdam Zuid and Schiphol Airport travel via Utrecht Centraal. The extra travel time is up to 30 minutes.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between:

  • Friday, August 20, 2021 4:00 AM to Saturday, August 21, 2021 3:00 AM
  • Saturday, August 21, 2021 3:00 AM to Monday, August 23, 2021 2:00 AM