Engineering works elsewhere: Utrecht - Rotterdam
Situation
Between Utrecht Centraal and Rotterdam Centraal the timetable has been changed due to engineering works elsewhere.
The extra travel time is about 15 minutes.
Period
Between Saturday, September 4, 2021 6:30 AM hours and Sunday, September 5, 2021 9:30 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2800 Rotterdam C. - Utrecht C. is cancelled between Utrecht Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 4, 2021 6:30 AM and Sunday, September 5, 2021 9:30 PM.