Engineering works: Blerick
Situation
From and to Blerick the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, September 11, 2021 4:00 AM hours and Monday, September 13, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo has a changed schedule between Schiphol Airport and Venlo (only in direction of Venlo)
- Intercity 3700 Dordrecht - Schiphol Airport - Utrecht C. - Venlo has a changed schedule between Dordrecht and Venlo (only in direction of Venlo)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 11, 2021 4:00 AM and Monday, September 13, 2021 2:00 AM.